ASIC equipment and professional hosting

ASIC mining hosting: Air and Hydro

Buy ASIC mining equipment with hosting, or plan a move for miners you already own. Compare air and hydro cooling, prepare your operating budget and request an itemized equipment and hosting quote.

A written quote before you commit. Availability and compatibility reviewed for your project.

Choose the right infrastructure

Air or Hydro: start with the exact equipment

Air cooling uses airflow through the miner. Hydro models require a compatible liquid-cooling circuit. Choose the infrastructure for your equipment, power requirements and deployment plan.

Buying equipment and hosting

Plan a multi-machine purchase with the hosting requirements considered from the start. Compare the equipment cost and operating costs together.

Price my equipment and hosting project

Already own a fleet?

Tell us your exact models, quantities and current location. Compatibility, capacity and transport arrangements must be confirmed before shipping.

Discuss hosting for my miners

Know what your hosting quote covers

Hosting is quoted for the selected location, equipment and capacity. Your written offer should identify each charge, its currency and what is included.

Equipment
Exact model and configuration, quantity, condition and batch availability. Existing miners are assessed separately.
Transport and installation
Shipping, handling, setup and any one-time charges, with the expected deployment schedule.
Electricity and cooling
Rate per kWh, currency, billing method and any cooling surcharge. These depend on the selected location and offer.
Recurring service costs
Management, monitoring, maintenance and support: included services, additional charges and responsibilities.
Deposit and contract
Required deposit, payment terms, duration, renewal, removal of equipment and applicable taxes.

From your project to a deployment plan

  1. Tell us about your project

    Share the models or target equipment, quantity, budget and preferred timing.

  2. Review the written offer

    Confirm compatibility, location, capacity, itemized costs and contractual terms before committing.

  3. Coordinate installation

    Once the offer is accepted and conditions are met, agree on shipping, commissioning and access to monitoring.

Compare equipment and prepare your hosting request

Estimate monthly energy use

Use the exact power draw and number of machines to estimate kWh, then separate energy, cooling, management and upfront costs.

Read the ASIC hosting cost guide

Find equipment for your deployment

Compare ASIC specifications and ask us to confirm the exact variant, batch availability and hosting compatibility.

Browse Bitmain Antminer equipment

Meet Captain Mining

Real people behind your mining project

Get to know Captain Mining through photos of ASIC equipment, mining infrastructure and Kevin on site.

  • ASIC equipment
  • Air and hydro hosting
  • Support for your project
Discuss my project
20-second presentation · English

Let’s talk about your deployment

Get my equipment and hosting quote

You do not need every specification ready. Explain your project in your own words. Our team will reply by email to clarify your requirements and prepare your quote.

Add project details (optional)
Requesting a quote does not reserve equipment or commit you to a purchase. Your email is used to answer this request.

Questions before arranging hosting

Can any ASIC use either cooling system?

No. Air-cooled, hydro-cooled and immersion equipment have different installation requirements. The exact model and its power and cooling requirements must be checked for the selected location.

Can you reserve capacity or promise an installation date now?

Availability and the deployment schedule need to be confirmed for your batch, quantity and hosting location. A quote request does not reserve machines or hosting capacity.

Where can I find the full recurring cost and contract term?

Ask for a written offer identifying electricity, cooling, service charges, currency, deposit, duration and exit conditions. Compare the complete offer rather than the electricity rate alone.

Is a mining return guaranteed?

No. Mining output, cryptocurrency prices, network difficulty, downtime and operating costs vary. Buying equipment and arranging hosting do not guarantee income or a payback period.