ASIC Mining Hosting Costs in Canada: How to Compare Quotes
The cost of ASIC hosting in Canada depends on more than a price per kWh. Your machine configuration, quantity, cooling requirements and service agreement determine what the quote covers. Start with an itemized proposal and compare the same scope across providers.
Need numbers for your own equipment? Request an itemized hosting quote from CaptainMining. Include the exact models, quantity and whether you need equipment as well as hosting.
Separate upfront payments from recurring costs
A useful quote shows when each payment is due and what it pays for. Keep an equipment purchase separate from hosting charges so you can compare hosting for machines you already own with a combined purchase-and-hosting proposal.
- Equipment and delivery: machine price, accessories, transport, applicable taxes and any import-related costs assigned to you.
- Setup: receiving, installation, configuration or activation charges, if applicable.
- Recurring operation: electricity or capacity charges, cooling and service fees.
- Additional work: repairs, replacement parts, storage or return shipping when excluded from the base offer.
- Deposits: amounts held separately and the conditions for applying or returning them.
Understand kW, kWh and the billing method
Kilowatts describe power. Kilowatt-hours describe energy consumed over time. For a simple estimate, multiply the machine’s power in kW by the operating hours. Use the power for the exact configuration being quoted, not a different version from the same product family.
Illustrative energy calculation: 3.5 kW × 24 hours × 30 days = 2,520 kWh. Ten identical machines operating under those assumptions would use 25,200 kWh. These figures assume a constant load and uninterrupted operation; they exclude separately accounted auxiliary equipment.
Multiply the applicable energy quantity by the rate in your written quote, then add charges outside that rate. If the agreement uses reserved capacity, a flat monthly price or another billing method, ask for the corresponding calculation instead. A lower advertised energy rate can still result in a higher overall bill when other charges differ.
Ask what happens when conditions change
Confirm the currency, billing period, payment schedule and how any rate adjustment works. Ask how downtime, reduced operation and planned interruptions affect charges. Distinguish what is measured from what is billed: an energy meter reading and a reserved-capacity obligation may answer different questions.
For a proposed 12- or 24-month agreement, read the minimum commitment, renewal and exit terms before deciding. The applicable duration and charges must come from your offer; an example in a blog is not a contract.
Compare air and hydro hosting on the full scope
Request a proposal for the cooling system your machines require. Confirm which infrastructure and cooling services are included, and whether any additional charges apply. See our air-cooled ASIC hosting and hydro ASIC hosting pages to prepare your questions.
Keep operating cost separate from projected mining revenue
A hosting quote describes charges and services. It does not establish a guaranteed mining profit or payback period. A projection also needs dated assumptions for network conditions, coin prices, pool fees and operating availability. Review a less favorable scenario as well as the central estimate, including expenses that remain payable if revenue falls.
For the service side of your comparison, use our ASIC hosting services checklist.
Monthly energy examples: one miner or a five-machine fleet
Use this table to check the arithmetic in a hosting proposal. These are illustrative constant loads, not specifications for a particular product or a CaptainMining price offer. Each example assumes 24 hours per day for 30 days.
| Power per miner | One miner | Five miners |
|---|---|---|
| 3.0 kW | 2,160 kWh | 10,800 kWh |
| 3.5 kW | 2,520 kWh | 12,600 kWh |
| 6.0 kW | 4,320 kWh | 21,600 kWh |
Energy charge = billed kWh × the applicable rate per kWh. Add cooling and fixed service charges only when they are outside that rate. Calculate each currency separately before conversion. External cooling equipment may add consumption; ask how that consumption is allocated.
Build a quote you can compare line by line
- At the start: equipment, shipping, installation and deposit, each listed separately.
- Every billing period: energy calculation, cooling calculation, fixed fee per unit, currency and applicable taxes.
- When needed: diagnostic work, repairs, replacement parts and transport.
- At the end: notice requirements, removal, packing, return shipping and deposit treatment.
Does a lower electricity rate always mean a lower hosting bill?
No. Compare the same machine quantity, operating hours and service scope. A rate that includes cooling cannot be compared directly with a rate that excludes it. Ask each provider to show a complete monthly example using your exact equipment.
For a concrete Hydro equipment example, see the S21+ Hydro 395T installation and energy guide. If you are still choosing equipment, use the air versus Hydro installation comparison before requesting prices.
What to send with a quote request
Provide the full model references, quantity, cooling type, desired start date and whether the machines are already purchased. Add your questions about recurring costs, service responsibilities or the proposed term. If you are comparing offers, ask for equivalent line items and exclusions.
Get a written breakdown for my hosting project. You can request a quote before making an equipment purchase.