ASIC equipment and professional hosting

Air-cooled ASIC hosting for your mining fleet.

Buying several air-cooled miners or moving existing equipment? Plan the hosting location, power requirements and operating costs with our team.

A written quote before you commit. Availability and compatibility reviewed for your project.

Choose the right infrastructure

For ASICs designed for air cooling

Air-cooled ASICs rely on fans and adequate ventilation. We review the exact configuration, power draw and hosting compatibility. Hydro and immersion models require a different installation.

Buying equipment and hosting

Plan a multi-machine purchase with the hosting requirements considered from the start. Compare the equipment cost and operating costs together.

Price my equipment and hosting project

Already own a fleet?

Tell us your exact models, quantities and current location. Compatibility, capacity and transport arrangements must be confirmed before shipping.

Discuss hosting for my miners

Know what your hosting quote covers

Hosting is quoted for the selected location, equipment and capacity. Your written offer should identify each charge, its currency and what is included.

Equipment
Exact model and configuration, quantity, condition and batch availability. Existing miners are assessed separately.
Transport and installation
Shipping, handling, setup and any one-time charges, with the expected deployment schedule.
Electricity and cooling
Rate per kWh, currency, billing method and any cooling surcharge. These depend on the selected location and offer.
Recurring service costs
Management, monitoring, maintenance and support: included services, additional charges and responsibilities.
Deposit and contract
Required deposit, payment terms, duration, renewal, removal of equipment and applicable taxes.

From your project to a deployment plan

  1. Tell us about your project

    Share the models or target equipment, quantity, budget and preferred timing.

  2. Review the written offer

    Confirm compatibility, location, capacity, itemized costs and contractual terms before committing.

  3. Coordinate installation

    Once the offer is accepted and conditions are met, agree on shipping, commissioning and access to monitoring.

Let’s talk about your deployment

Get my Air hosting quote

You do not need every specification ready. Explain your project in your own words. Our team will reply by email to clarify your requirements and prepare your quote.

Add project details (optional)
Requesting a quote does not reserve equipment or commit you to a purchase. Your email is used to answer this request.

Questions before arranging hosting

Can any ASIC use either cooling system?

No. Air-cooled, hydro-cooled and immersion equipment have different installation requirements. The exact model and its power and cooling requirements must be checked for the selected location.

Can you reserve capacity or promise an installation date now?

Availability and the deployment schedule need to be confirmed for your batch, quantity and hosting location. A quote request does not reserve machines or hosting capacity.

Where can I find the full recurring cost and contract term?

Ask for a written offer identifying electricity, cooling, service charges, currency, deposit, duration and exit conditions. Compare the complete offer rather than the electricity rate alone.

Is a mining return guaranteed?

No. Mining output, cryptocurrency prices, network difficulty, downtime and operating costs vary. Buying equipment and arranging hosting do not guarantee income or a payback period.